I normally start at 7:00 and inspect my tools first. These days, I’m working on an apartment building. Yesterday, I installed some windows. Tomorrow, I’m going to repair a wall, and at 10:00 I’ll be measuring the new opening.
STAGE 2 · 7 MIN · PEOPLE
Who does what?
Connect each worker with a responsibility. Then make a complete sentence.
FOREMAN
gives daily instructions and organizes the crew
SITE SUPERVISOR
inspects the site and checks progress
ENGINEER
checks technical plans and calculations
ARCHITECT
designs the building
BRICKLAYER
builds walls with bricks
CARPENTER
cuts and installs wood
ELECTRICIAN
installs wiring and electrical equipment
PLUMBER
installs and repairs pipes
PAINTER
paints walls and ceilings
ROOFER
builds and repairs roofs
Complete orally
A carpenter usually…
A plumber is responsible for…
Yesterday, the electrician…
Right now, the laborers are…
Tomorrow, the supervisor is going to…
At 9:00 tomorrow, the bricklayer will be…
A carpenter usually cuts and installs wood. A plumber is responsible for pipes. Yesterday, the electrician connected the wires. Right now, the laborers are carrying materials. Tomorrow, the supervisor is going to inspect the site. At 9:00 tomorrow, the bricklayer will be building a wall.
STAGE 3 · 8 MIN · TOOLS
Choose the right tool
Study the visual, name every tool, and explain its function.
hammer drive nailsdrill make holessaw cut woodscrewdriver tighten screwswrench tighten nutstape measure measure distancelevel check straightnessshovel move dirtwheelbarrow transport materialsladder reach high places
What do you need?
Make a hole in a wall.
Cut a piece of wood.
Check if a shelf is straight.
Measure a door.
Move sand across the site.
Tighten a pipe connection.
Drive a nail into wood.
Reach the roof.
1. a drill · 2. a saw · 3. a level · 4. a tape measure · 5. a wheelbarrow · 6. a wrench · 7. a hammer · 8. a ladder
STAGE 4 · 8 MIN · MATERIALS + VERBS
What are we building with?
Choose a material and the action that naturally goes with it.
brickbuild a wallcementmix cementconcretepour concretesand & gravelmix materialswood / lumbermeasure and cutsteelreinforce a structurepipeinstall or replacewireconnect carefullytileinstall or removenail / screwsecure materials
Name three materials and two actions for each: a bathroom · a roof · a concrete wall · an electrical system · a wooden staircase.
For a bathroom, we may need tiles, pipes and concrete. The plumber installs the pipes, and the tiler measures and installs the tiles.
STAGE 5 · 8 MIN · SAFETY
Spot the hazards
For every hazard: describe the problem, say what could happen, and give an instruction.
hard hatsafety vestwork bootsglovessafety gogglesear protectionsafety harnesswarning signfirst-aid kitfire extinguisherscaffoldinghazard
SAFETY REPORT
There is / are…→Someone could…→Imperative!
There is water near the cable. Someone could get an electric shock. Turn off the electricity and keep the area clear.
There is an unguarded opening in the floor, so someone could fall. Put up a barrier and a warning sign immediately. There are also tools on the floor, so pick them up. The worker using the saw needs safety goggles and ear protection.
STAGE 6 · 7 MIN · NATURAL ENGLISH
Phrasal verbs on site
Use the complete expression—not only the main verb.
put on
Put on your safety vest.
set up
Set up the scaffolding.
take down
Take down the old scaffolding.
clean up
Clean up the work area.
pick up
Pick up the tools.
turn off
Turn off the machine.
run out of
We’ve run out of cement.
look over
Look over the plans.
carry out
Carry out an inspection.
tear down
Tear down the old wall.
Complete orally
Please ___ the tools from the floor.
We need to ___ the area before leaving.
The supervisor will ___ the plans.
They’re ___ the scaffolding now.
Always ___ the machine first.
We can’t continue. We’ve ___ cement.
1. pick up · 2. clean up · 3. look over · 4. setting up · 5. turn off · 6. run out of
Stress the strong partcon-STRUC-tionen-gi-NEERe-lec-TRI-cianSCA-ffol-dinge-QUIP-mentSAFE-ty
STAGE 7 · 9 MIN · GRAMMAR MAP
One site, seven time views
Choose the time meaning first. Then use the matching formula.
ROUTINE
Present Simple
subject+base verb / verb-s
The foreman checks the schedule every morning.
NOW
Present Continuous
subject+am/is/are+verb-ing
They are pouring concrete right now.
FINISHED PAST
Past Simple
subject+past form
We installed the windows yesterday.
PAST IN PROGRESS
Past Continuous
subject+was/were+verb-ing
We were working when it started raining.
DECISION / PREDICTION
Will
subject+will+base verb
I’ll call the supplier. I think the work will finish on time.
PLAN / EVIDENCE
Going to
subject+am/is/are going to+base verb
We’re going to install the windows tomorrow.
FUTURE IN PROGRESS
Future Continuous
subject+will be+verb-ing
At 10:00, we’ll be working on the roof.
Time-marker challenge
every morningright nowyesterdaywhen the rain startedtomorrowI thinktomorrow at 11:00
Every morning, we inspect the equipment. · Right now, we are building an interior wall. · Yesterday, we installed the wiring. · We were pouring concrete when the rain started. · Tomorrow, we’re going to install the windows. · I think the delivery will arrive late. · Tomorrow at 11:00, we’ll be working on the roof.
STAGE 8 · 6 MIN · LIVE SITE
It’s 10:00 a.m. What’s happening?
Describe the whole scene with the Present Continuous.
HAPPENING NOW
subject+am / is / are+verb-ing
The electrician is checking the wiring. Two workers are carrying wood.
Who is measuring wood?
Who is building a wall?
What is the electrician doing?
Who is looking over the plans?
What is the plumber installing?
Is anyone painting?
The carpenter is measuring a piece of wood. A bricklayer is building a wall. The electrician is checking the wiring, and the site supervisor is looking over the plans. Two laborers are carrying a wooden board. In front of them, a plumber is installing a pipe.
STAGE 9 · 6 MIN · PAST STORY
What happened yesterday?
Use a long action in progress and the short event that interrupted it.
BACKGROUND + INTERRUPTION
was / were + verb-ing+when+past simple
We were pouring concrete when it started raining.
CONCRETE
pour concrete / rain start
WOOD
cut wood / saw stop
LADDER
climb ladder / supervisor call
WIRES
check wires / lights go out
PIPE
install pipe / notice crack
ROOF
repair roof / storm arrive
We were pouring concrete when it started raining. · The carpenter was cutting wood when the saw stopped. · I was climbing the ladder when the supervisor called me. · The electrician was checking the wires when the lights went out. · The plumber was installing the pipe when he noticed a crack. · The roofers were repairing the roof when the storm arrived.
Build the report
Choose one incident. Add: the time, the tool, the safety risk, the immediate instruction, and the final result.
STAGE 10 · 6 MIN · FUTURE PLAN
The plan changed
Read the visual story from left to right: the plan, the warning, and tomorrow’s work.
PLAN
BE GOING TO
We’re going to install the windows tomorrow.
VISIBLE EVIDENCE
BE GOING TO
Look at those clouds. It’s going to rain.
IN PROGRESS AT A FUTURE TIME
WILL BE + -ING
At 10:00, we’ll be installing the windows.
INSTANT DECISION
WILL
I’ll help you cover the materials.
React immediately
We don’t have enough bricks.
This ladder is dangerous.
The drill isn’t working.
The supervisor needs the report.
Dark clouds are approaching.
The client wants larger windows.
I’ll call the supplier. · I’ll secure the ladder. · I’ll get another drill. · I’ll prepare the report now. · It’s going to rain, so we’ll cover the materials. · We’re going to measure the wall again, and tomorrow at 10:00 we’ll be enlarging the openings.
STAGE 11 · 7 MIN · PROBLEM SOLVING
Worker and supervisor
Choose a scenario and solve it aloud. Change roles for the second round.
1 · Missing materials
The crew needs to build a wall, but the bricks haven’t arrived.
supplier · another area · pipes · this afternoon2 · Broken drill
The drill stopped while a worker was making holes.
turn off · inspect · safe tool · replacement3 · Bad weather
Roofers are working, but dark clouds are approaching.
Our team normally starts at 7:00, and we inspect our tools every morning. Everyone wears a hard hat, a safety vest and work boots. Right now, the bricklayers are building an interior wall, the carpenter is measuring wood, and the electrician is connecting wires. Yesterday, we installed three windows. We were pouring concrete when it started raining, so we cleaned up the area and covered the materials. Tomorrow, we’re going to repair the roof. I think we’ll finish on time, and at 10:00 we’ll be setting up the scaffolding. Put on your harness and keep the area clear.
Voice report · 2–3 minutes
Record a construction site update with eight construction words, three phrasal verbs, two safety instructions, and the connectors when, while, because, but, so.
Site update complete
You can now describe a construction site from routine to future plan.